Rapid concrete SB20
A19 Mecklenburg-Vorpommern

Agile, fast and reliable
Rapid concrete over night

Years of experience - Top quality materials and employees - Agile and fast. All these attributes come into play at nighttime construction sites on highways when damaged concrete slabs have to be replaced within the shortest possible time. The rehabilitation of individual concrete slabs on the A19 near the Röbel/Müritz exit is a prime example of all these advantages and, in particular, a prime example of the performance benefits of our SB20 rapid concrete. Shortly before the summer heatwave, broken and damaged concrete slabs still had to be rehabilitated on a section of the A19. For this purpose, the section was fully closed overnight so that the work could be carried out safely and without disruptions. After the slabs had been cut out and dismantled using a cutting machine and an excavator with a caulking hammer, dowels and anchors were set for the new slabs. After that, the special mobile concrete mixer was used, which freshly mixes the Sb20 rapid concrete on site. This ensures a consistent quality and ensures that no surplus production is mixed. After the concrete had been placed, the finishing work (restoring the surface structure, etc.) was completed and 2 hours later the traffic could start rolling again. A masterpiece of the rapid concrete crew.

Matthias Becke

Matthias Becke

Telefon Matthias BeckeTelefon Matthias BeckeE-Mail Matthias BeckeE-Mail Matthias Becke
Chat