At Braunschweig-Wolfsburg Airport, our men from Lower Saxony shone with a hall coating!
This involved coating around 1400 m² of asphalt. In the winter service hall of Braunschweig Airport, the first task was to remove oils and dirt from the existing hall floor. Then the preparation of the hall floor for coating began.
Our HB flex material, which is resistant to engine oil and diesel, was used to bring the airport hall back into shape and to protect it from future influxes.